BREEAM Free Cooling
Contents |
[edit] Aim and benefits
Free cooling is promoted via BREEAM as it can reduce the need for mechanical cooling systems providing an energy and carbon saving. It can result in simpler building operation and easier maintenance. It can also contribute to reducing overheating for adaptation to climate change.
This issue offers the following potential benefits to end users and clients:
- Reduced energy consumption due to less cooling being required
- Increased thermal comfort for building occupants
[edit] When to consider
Concept Design Stage RIBA Stage 1 and 2
[edit] Step by step guidance
Free cooling is assessed as part of BREEAM Credit Ene 4 Low Carbon Design.
In order to achieve this element of the credit the Passive Design Analysis credit must first be achieved. The passive design analysis must include an analysis of free cooling and identify opportunities for the implementation of free cooling solutions.
The building must then use any of the following free cooling strategies to award the free cooling credit:
- Night time cooling
- Ground coupled air cooling
- Displacement ventilation (not linked to any active cooling system)
- Ground water cooling
- Surface water cooling
- Evaporative cooling, direct or indirect
- Desiccant dehumidification and evaporative cooling, using waste heat
- Absorption cooling, using waste heat
- The building does not require any significant form of active cooling or mechanical ventilation (i.e.. naturally ventilated).
The free cooling measure proposed must be verified and the energy reduction shown when compared to a mechanical system.
This is generally carried out via dynamic simulation modelling with the free cooling energy demand compared with a mechanical system and the associated energy savings reported. This will require the engineer to run two models - one the proposed design and the other a baseline to measure savings. The details of both should be included within the model report.
Free cooling is an enhanced passive design method that requires engineering design and modelling to demonstrate its effectiveness.
[edit] Questions to ask while seeking compliance
What free cooling strategy is proposed?
Will this strategy be implemented across the whole building? The credit cannot be award if free cooling is only utilised in part with mechanical cooling systems included elsewhere.
Who will carry out the analysis and what are qualifications do they have? Should be the building services engineer or an accredited energy assessor.
What tool is being used to model the free cooling demand reduction?
[edit] Tools and resources
BREEAM Manual
[edit] Tips and best practice
The free cooling should apply to all occupied spaces in the building. Small IT rooms and lift motor rooms are excluded.
Mechanical ventilation may only be used for small areas, e.g.. for kitchenettes and toilets.
Free cooling appraisal can typically be assessed using dynamic simulation modelling such as IES or TAS. This type of analysis is generally over and above what is carried out as part of the simulation duties on a project so needs to be included and assigned to the appropriate design team member.
[edit] Typical evidence
[edit] Design Stage
Confirmation the Passive design credit has been awarded and copy of the report detailing free cooling strategies.
Copy of the dynamic simulation modelling results showing feasibility of the free cooling strategy.
Drawings or specifications confirming the free cooling strategy will be implemented.
Confirmation the free cooling modelling and strategy has been prepared by a suitably qualified engineer/assessor.
[edit] Post Construction Stage
As Design Stage
[edit] Applicable Schemes
The guidelines collated in this ISD aim to support sustainable best practice in the topic described. This issue may apply in multiple BREEAM schemes covering different stages in the life of a building, different building types and different year versions. Some content may be generic but scheme nuances should also be taken into account. Refer to the comments below and related articles to this one to understand these nuances. See this document for further guidelines.
- UK New Construction 2014
BRE Global does not endorse any of the content posted and use of the content will not guarantee the meeting of certification criteria.
--Sarah Peterson 15:24, 20 Feb 2018 (BST)
--Tom Blois-Brooke 16:34, 01 Jul 2019 (BST)
[edit] Related articles on Designing Buildings
Featured articles and news
PPN 021: Payment Spot Checks in Public Sub-Contracts
Published following consultation and influence from ECA.
Difficult Sites: Architecture Against the Odds
Free exhibition at the RIBA Architecture Gallery until 31 May.
Designing Buildings reaches 20,000 articles
We take a look back at some of the stranger contributions.
Lessons learned from other industries.
The Buildings of the Malting Industry. Book review.
Conserving places with climate resilience in mind.
Combating burnout.
The 5 elements of seiri, seiton, seiso, seiketsu and shitsuke.
Shading for housing, a design guide
A look back at embedding a new culture of shading.
The Architectural Technology Awards
The AT Awards 2025 are open for entries!
ECA Blueprint for Electrification
The 'mosaic of interconnected challenges' and how to deliver the UK’s Transition to Clean Power.
Grenfell Tower Principal Contractor Award notice
Tower repair and maintenance contractor announced as demolition contractor.
Passivhaus social homes benefit from heat pump service
Sixteen new homes designed and built to achieve Passivhaus constructed in Dumfries & Galloway.
CABE Publishes Results of 2025 Building Control Survey
Concern over lack of understanding of how roles have changed since the introduction of the BSA 2022.
British Architectural Sculpture 1851-1951
A rich heritage of decorative and figurative sculpture. Book review.
A programme to tackle the lack of diversity.